Hørsholm
Pivotech-skateable architecture design company
skateboarding.architecture.design.planning.landscape.skatepark.skateparks.skate.skatepark.park.skateable.
21659
portfolio_page-template-default,single,single-portfolio_page,postid-21659,qode-social-login-1.1.2,stockholm-core-1.0.9,select-theme-ver-5.1.6,ajax_fade,page_not_loaded,wpb-js-composer js-comp-ver-6.0.3,vc_responsive

Hørsholm

  • Location: Hørsholm , Denmark
  • Year: 2014
  • Area: 750m²
  • Skate design: Pivotech
  • Construction: ENR,OK Nygaard A/S
  • Client/Developer: Hørsholm Municipality

Hørsholm skatepark- Denmark’s most ”flowy” skatepark. The skatepark was built in a slope, which demanded that the design make up 3 meters in height difference from top to bottom. Not an easy task, but solvable and even an advantage with the right design. Built as an addition to an existing wooden skatepark, key features include a bigger bowl, a smaller flow area, a blended-in mini ramp and a fully skateable deck surrounding the entire park. The materiality consists of perfectly finished concrete, along with granite pool coping, Corten steel forms and smooth steel coping.